Infrastructure

Thanks to the financial support obtained through the Croatian Science Foundation project HRZZ-UIP-2017-05-7337 and partly through the financial support of Ruđer Bošković Institute our group was able to renovated the laboratory that was using in the seventh wing of the Institute.

Electrical installations were replaced by new ones, new air conditioner and new lights were installed in the laboratory, new laboratory chairs were purchased, the tiles around the sink were installed, and the walls in the laboratory were painted so the whole Laboratory got the new and refreshed look.

Also, with the financial participation of the IRB, the old windows were replaced with new energy-efficient ones.

The laboratory was also equipped with new small laboratory equipment necessary for work on the project purchased with Croatian Science Foundation funding.

We thank the Croatian Science Foundation and the Ruđer Bošković Institute for making this renovation possible.

The lab after the renovation

The lab before the renovation